ASEZ Komsomolsk
ASEZ “Komsomolsk”
created on June 25, 2015
total area – 9 350 ha
Specialization:
- Woodworking
- Metalworking
- Food industry
- Mechanical engineering
- Machine processing
- Tourism and recreation
Competitive advantages:
- high scientific and technological potential;
- high industrial potential;
- developed transport infrastructure;
- developed state support programs.
ASEZ “Komsomolsk” consists of four sites:
The site is envisioned for creation of high-technology enterprises and launching productions for machine processing of parts, cutting tools and composite materials.
Territory:
460 ha – land site area within cadastral units
60 ha – industrial site area
25 ha – free land plots
“Greenfield” - lands free from structures
“Brownfield” – land plots with facilities for leasing
Production premises cost of leasing for the ASEZ residents – 170 RUB/m2.
One of the largest and popular recreation areas of the Russian Far East. Modern mountain ski resort.
Territory:
272 ha – land site area within cadastral units
“Greenfield” – lands free from structures
Land plot cost of leasing for the ASEZ residents – 1,30 RUB/m2.
The site is suggested for arranging machine processing production, mechanical engineering, food industry and other productions. It has run-into railway lines, load/discharge platforms equipped with over-head travelling cranes.
Territory:
60 ha – land site area within cadastral units
“Brownfield” – land plots with facilities for leasing
The site is suggested for arranging various types of production, has connected railways.
Territory:
7 721 ha – land site area within cadastral units
Brownfield” – land plots for construction of industrial facilities.